All resources
Video tutorial

How to Run a Fit-Gap Workshop

A silent, step-by-step guide to preparing, running and closing an ERP fit-gap workshop that produces decisions, not wish lists.

Free

Free 2-minute video lesson. A silent, step-by-step guide to preparing, running and closing an ERP fit-gap workshop that produces decisions, not wish lists. Short, visual and to the point, so you can watch it between meetings and apply it the same day.

This silent video teaches a practical method for ERP fit-gap workshops. It covers preparation with process lists and demo data, running the session as a demo of standard functionality, classifying each requirement as fit, configuration, workaround or gap, and challenging gaps before they become customizations. It ends with how to document outcomes and get sign-off. Built for Dynamics 365 functional consultants, business analysts and freshers who want shorter workshops and cleaner requirement logs.

What you'll learn

  • The core principle
  • Prepare before the session
  • Who must be in the room
  • Run the session
  • Four classifications
  • Challenge every gap
  • Requirement or preference?
  • Illustrative: returns process
  • Document the outcome
  • Key idea
  • Close the loop

Who it's for

Project managers, solution architects, functional consultants and client-side leads who want their ERP program to go live on time and actually deliver value.

Go deeper

Pair this lesson with the related free e-books and templates in the resource library, and read the latest practical articles on the blog.

Lesson notes (text version of the video)

The core principle: Demo, don't interview. Show standard functionality first, then ask what is missing.

Prepare before the session

  1. Pick one end-to-end process per workshop
  2. Load realistic demo data
  3. Collect current pain points in advance
  4. Invite decision makers, not only users
  5. Share the agenda and scope

Who must be in the room

  • Process owner who can decide
  • Two or three key users
  • Functional consultant running the demo
  • Note taker updating the requirement log

Run the session

  1. Confirm scope and goals in five minutes
  2. Walk the process in the system
  3. Capture each requirement as it appears
  4. Classify it before moving on
  5. Recap decisions at the end

Four classifications

  • Fit: works in standard as shown
  • Configuration: standard with setup changes
  • Workaround: process change, no code
  • Gap: needs an extension, integration or ISV

Challenge every gap

  • What business outcome does this support?
  • What happens if we do it the standard way?
  • Is it legal, contractual or just habit?
  • Could an ISV or Power Platform cover it?

Requirement or preference?

  • Real requirement: Regulatory or tax rule; Customer contract obligation; Clear cost or revenue impact
  • Preference: Legacy screen layout; We have always done it; Nice-to-have report

Illustrative: returns process

  1. Demo standard return order flow
  2. User asks for an auto-refund rule
  3. Team checks policy and volume
  4. Classified as workaround with approval flow

Document the outcome

  • Requirement ID, process and description
  • Classification and rationale
  • Priority using MoSCoW
  • Owner and next action

Key idea: Every gap you avoid in a workshop saves design, build, test and upgrade effort later.

Close the loop

  1. Send the log within 24 hours
  2. Get process owner sign-off
  3. Estimate gaps before design starts

Let's connect

I'm Pranshu Shubham, a Microsoft Dynamics 365 F&O Solution Architect and PMP-certified program lead with 8+ years of ERP and AI transformation across the USA, Europe and APAC. I created this resource from real project experience, and I'd love to hear how you use it.