ERP Requirements Traceability Matrix
Trace every ERP requirement from workshop to design, build, test and UAT sign-off, with fit-gap classification, automatic trace checks and a change log.
FreeFree Excel workbook. Trace every ERP requirement from workshop to design, build, test and UAT sign-off, with fit-gap classification, automatic trace checks and a change log. Download it, add your project details and use it today: no sign-up for software, no paywall.
A working requirements traceability matrix for Dynamics 365 and other ERP programs. Each requirement is tagged to an end-to-end process from the Microsoft business process catalog, classified by fit or gap, and linked to its design document, build work item and test cases. Built-in formulas flag requirements with missing design or test links and items that have gone stale. A change log captures every change to approved scope, and the summary sheet gives you fit rate, trace coverage, test status and UAT sign-off counts for steering committee reporting. Use it from discovery through go-live.
What's inside
- Requirements Traceability: One row per requirement. Trace each one from source to design, build, test and sign-off.
- Change Log: Record every change to an approved requirement. Link back to the Req ID.
- Summary: key numbers calculated automatically from your data
- Drop-down lists, worked example rows and formulas you can rely on
How to use it
- Agree an ID convention before the first workshop, for example REQ-<process code>-<number>, and never reuse a retired ID.
- Capture each requirement as one testable statement of business need. Split compound requirements into separate rows.
- Tag each row to an end-to-end process (L1) and business process (L3) so the matrix lines up with your process catalog.
- Classify fit or gap during fit-gap sessions and record the solution approach in one or two plain sentences.
- Add the design document reference, build work item and test case IDs as they are created. The Trace check column shows what is still missing.
- Log every change to an approved requirement on the Change Log sheet and record the decision and who made it.
- Review the Summary sheet weekly. Before UAT exit, every Must requirement should show Trace check = Complete and UAT sign-off = Signed off.
Who it's for
Project managers, solution architects, functional consultants and client-side leads who want their ERP program to go live on time and actually deliver value.
Columns in each sheet
- Requirements Traceability: Req ID, End-to-end process (L1), Business process (L3), Requirement statement, Type, Source, Business owner, Priority (MoSCoW), Fit / Gap, Solution approach, Design doc ref, Build work item, Test case ID(s), Test status, UAT sign-off, Status, Release / wave, Last updated, Trace check, Days since update
- Change Log: Change ID, Req ID, Date raised, Change description, Raised by, Impact, Effort (days), Affects, Decision, Decided by, Decision date, Days to decide
What is a requirements traceability matrix (RTM)?
A requirements traceability matrix is a table that links every requirement to the work that delivers and proves it: the design, the build item, the test cases and the final sign-off. If a requirement has no design or no passed test, the matrix shows it straight away. On ERP projects it's the simplest way to prove to a steering committee, and to auditors, that everything agreed in discovery was actually delivered.
Forward, backward and bidirectional traceability
- Forward traceability follows each requirement to its design, build and tests, so nothing agreed gets missed.
- Backward traceability follows each design, build item or test back to a requirement, so nobody builds things no one asked for (scope creep).
- Bidirectional traceability does both. This template is bidirectional: every row starts at a requirement ID, and every design, work item and test case refers back to it.
Requirements traceability matrix example: one row, explained
| Column | What to enter | Example |
|---|---|---|
| Req ID | Unique, never reused | REQ-O2C-014 |
| Requirement | One testable statement of business need | Credit limit check blocks sales order confirmation when the customer is over limit |
| Process (L1 / L3) | End-to-end process and business process | Order to cash / Manage customer credit |
| Priority | MoSCoW: Must, Should, Could, Won't | Must |
| Fit / gap | Standard, configuration, extension or workaround | Configuration |
| Design reference | Functional or technical design document section | FDD-O2C-03 §4.2 |
| Build work item | Azure DevOps or Jira ID | ADO-1187 |
| Test case IDs | System, integration and UAT test cases | TC-O2C-031, UAT-O2C-008 |
| Test status | Not run, passed, failed, blocked | Passed |
| Trace check | Calculated: shows which links are missing | Complete |
| UAT sign-off | Business owner and date | Signed off, 14 Mar |
How to create a requirements traceability matrix in Excel
- Set up the columns above as an Excel table so filters and formulas extend automatically.
- Add data validation drop-downs for priority, fit/gap, test status and sign-off, so everyone uses the same values.
- Load requirements from your BRD or workshop notes, one testable requirement per row.
- Add a trace-check formula that flags rows missing a design reference or test case, for example
=IF(OR([@Design]="",[@Tests]=""),"Missing link","Complete"). - Use conditional formatting to highlight Must requirements that are failed or missing links.
- Build a summary sheet with COUNTIFS for fit rate, trace coverage, test pass rate and sign-off progress.
- Keep a change log for every change to approved requirements, with the decision and who made it.
This free template already has all of this built in, so you can skip straight to filling it in.
RTM vs BRD: what's the difference?
A business requirements document (BRD) explains the requirements in full: context, rules and examples. The RTM is the tracking index that follows each of those requirements through design, build and test. You need both: the BRD to agree what's needed, and the RTM to prove it was delivered.
Frequently asked questions
Is this requirements traceability matrix template free?
Yes. It's a free Excel download with no sign-up.
Can I use it in Google Sheets or with Jira and Azure DevOps?
It's built for Excel and also opens in Google Sheets (some Excel table formulas may need adjusting there). You can paste Jira or Azure DevOps work item IDs into the build and test columns.
Who owns the RTM on an ERP project?
Usually the business analyst or functional lead keeps it up to date, and the project manager reviews the summary at each status meeting.
When should traceability start?
In discovery, as soon as the first requirement is written. Adding it before UAT means rebuilding links from memory.
Related templates
- Business requirements document (BRD) template
- Dynamics 365 functional design document template
- UAT test script and defect log
- User story and acceptance criteria backlog
Let's connect
I'm Pranshu Shubham, a Microsoft Dynamics 365 F&O Solution Architect and PMP-certified program lead with 8+ years of ERP and AI transformation across the USA, Europe and APAC. I created this resource from real project experience, and I'd love to hear how you use it.
- Connect with me on LinkedIn and tell me what you're working on
- Have a question or a project in mind? Send me a message. I reply within 24 hours
- Explore more free e-books, templates and videos and the latest articles